Ft. Riley CGMCG Equine Loafing Shed
Subject: Ft. Riley CGMCG Equine Loafing ShedSolicitation Number: W911RX23Q0080Notice Type: SOLICITNAICS: 332311Set-Aside: Total Small BusinessNotice Published: 09-18-23Response Due: 09-20-23Agency: Department of the ArmyOffice: W6QM MICC-FT RILEYContact: Travis E Engle This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: FORT RILEY, KS 66442-0248Place of Performance: Fort Riley, KS 66442Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
Ft. Riley CGMCG needs to purchases ten (10) shelters for use in pastureland to properly house Military Working Equine (MWEs). Shelters can consist of wood or metal frame with sheet metal siding and roofing. Sheet metal should be 26 gauge through 8 gauge. The siding should cover the roof and 3 sides of the shed. The 4th side and floor should be open and does not require materiel. Kicker boards should line the inside of the sheds to prevent possible injury to Military Working Equine and to comply with the VetCOM SOP requirements. These boards need to cover the bottom 4 feet of the interior of the shed. The sheds can be no smaller than 10 feet wide, 7 feet high, and 20 feet long. Questions are due by 1100 CDT on 15SEP2023 Amendment 1: Changed the Quote Due Date to 20SEP2023 at 1100CDT. Clarified the requirement as a supply and install. Changed is the ARO delivery date from 30 Days to 90 days.