Side Connector Overhaul and Regeneration (SCOR) II
Subject: Side Connector Overhaul and Regeneration (SCOR) IISolicitation Number: M6700423R0006Notice Type: SOLICITNAICS: 811310Set-Aside: Woman Owned Small BusinessNotice Published: 09-18-23Response Due: 09-21-23Agency: Department of the NavyOffice: COMMANDERContact: DARRYL MOON This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (904) 696-5686Office Address: ALBANY, GA 31704-0313Place of Performance: Jacksonville, FL 32226Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The Contractor shall inspect and test twenty (20) INLS SCs and regenerate Auxiliary Support Equipment. The SCS to be inspected will be designated after task order award. Side Connector inspection and testing includes the removal of Ultra High Molecular Weight (UHMW) cover plates to gain access to the internal components, hydraulic pressure testing, reporting, and the re-assembly as outlined below. For Auxiliary Support Equipment, overhaul includes operational testing and inspection. Regeneration of the Auxiliary Support Equipment is considered corrective maintenance (Over and Above). The Contractor shall report any deficiencies in accordance with the Over and Above procedures identified in DFARS 252.217-7028.