Powerhouse and Dam Pump Room Roof Replacement, Russel Dam, Elberton, Georgia


Subject: Powerhouse and Dam Pump Room Roof Replacement, Russel Dam, Elberton, Georgia
Solicitation Number: W912HN21S5008
Notice Type: SRCSGT
Notice Published: 05-03-21
Response Due: 06-03-21

Agency: Department of the Army
Office: US ARMY ENGINEER DISTRICT SAVANNAH
Contact: Amy L Collins This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (912) 652-5505 Fax: (912) 652-5828
Office Address: SAVANNAH, GA 31401-3604



Click for official SAM (FBO) notice, additional information, and accompanying attachments

This is a Sources Sought/Request for Information only. This is not a Solicitation Announcement,nor is it a Request for Proposal. This request does not obligate the Government in any contractaward. The U.S. Army Corps of Engineers, Savannah District is issuing the sources soughtsynopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement for civil works construction. The result of this marketresearch will contribute to determining the method of procurement. The applicable NorthAmerican Industry Classification System (NAICS) code assigned to this procurement is 238160 Roofing Contractors. The contractor will complete the removal and replacement of the entire existing two-ply Granulesurfaced modified bitumen roof system and walking pads on all roof areas of thePowerhouse/Visitor Center Building. The contractor will replace the roof with a new 90-mil 1-ply EPDM roof system complete with associated flashings, insulation, sheet metal componentsand accessories necessary for a watertight roof system. EPDM shall be white in color to reflectsolar radiation. New roof shall provide a minimum R value of R-30. New roof system shalldrain naturally into existing drains and not hold standing water. Remove existing roof wall and curb flashings. Remove existing EPDM on all parapet walls. Install new heavy duty coverboard on both the horizontal and vertical surfaces of all parapet walls of Powerhouse Roof. New60-mil white EPDM will be installed over the cover boards with bonding adhesive.Walkboards/Walkpads shall be included and will match existing powerhouse layouts aroundHVAC units, exhaust fans, upstream and downstream parapet wall, ladder crossovers, and roofaccess hatch. EPDM walkway pads or equivalent shall be used. Walkboards/walkpads shall alsobe white in color if available. The contractor shall remove and replace the entire existing insulated tar and gravel built-up roofsystems on concrete deck on dam pump room. Remove existing pump room roof wall and curbflashings. Remove existing roofing of all parapet walls. Install new HD cover board onboth the horizontal and vertical surfaces of the parapet walls of Dam Pump Roof area. New 60-mil white EPDM will be installed over the cover boards with bonding adhesive. Replacementwith a new 90-mil 1-ply EPDM complete with associated flashings, insulation, sheet metalcomponents and accessories necessary for a watertight roof system. EPDM shall be white incolor to reflect solar radiation. New roof shall provide a minimum R value of R-30. New roofsystem shall drain naturally into existing drains and not hold standing water.Walkboards/walkpads shall be installed on Dam Pump Roof from the East side of the roofaround exhaust fan. White EPDM walkway pads or equivalent shall be used.Walkboards/walkpads shall also be white in color if available. A Minimum 20-year, no dollar limit, labor & material warranty from the manufacturer shall beprovided. All demolished roofing material shall be removed and properly disposed of bythe contractor. Power plant work hours are 06:00 to 16:30 M-Thurs. Contractor may be allowed to work on roofoutside of plant staff work hours if accessing from outside powerhouse with temporary exteriorstairs or approved lift. Contractor should work from South Carolina side to the Georgia side.Staging and access will be from the Georgia side, downstream of the Visitor Center. Safety is in accordance with the latest edition of the EM 385-1-1. A fall protection plan and qualified Site Safety and Health Officers (SSHO) will be required. Airborne irritants and high Volatile Organic Compound (VOC) products will only be used when coordinated with the plant staff to prevent intrusion into the powerhouse HVAC system. If you are interested in this project and/or your organization has the potential capacity to perform these services, please submit the following to the Point of Contact (POCs) information listed below: 1. Name and Address of your firm 2. Point of Contact (name/phone/email) 3. Company website 4. Data Universal Numbering System (DUNS) number (http://www.dnb.com) 5. Commercial and Government Entity (CAGE) code https://cage.dla/mil 6. Business Size, to include designation as HUBZone, 8(a), Service Disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman-Owned Business, and Large Business. The Government must be able to verify SBA certification of HUBZone, 8(a), and SDB via the System for Award Management (SAM) (https://www.beta.sam.gov). 7. Bonding capability for your firm in terms of single and aggregated bonding. 8. Capability statement addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. Please state if you have experience in industrial or commercial roof replacement or construction. If significant subcontracting (self-performance is less than 15%) or teaming is anticipated in order to deliver technical capability Attachments: RBR Powerhouse Roof Scope Pic 1 RBR Powerhouse Roof Scope Pic 2