TSS Ductless System at EWR ATCT


Subject: TSS Ductless System at EWR ATCT
Solicitation Number: TSS_Ductless_System_at_EWR_ATCT
Notice Type: SOLICIT
NAICS: 238220
Set-Aside: Total Small Business
Notice Published: 03-04-26
Response Due: 04-15-26

Agency: Department of Transportation
Office: FEDERAL AVIATION ADMINISTRATION
Contact: Elisha Distler This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (817) 222-4196
Office Address: FORT WORTH, TX 76177
Place of Performance: NJ 07114

Related Notices:
        04-01-26 SOLICIT

        04-10-26 SOLICIT

        04-07-26 SOLICIT

        04-23-26 SOLICIT

        03-04-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Mechanical · Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. · Install (1) 6-ton heat pump. Unit to be anchored to exterior concrete wall via on L-bracket steel frame. · Coordinate core penetrations through concrete wall for piping, electrical, and drain lines. Installation to include all wall waterproofing. · Provide and insulate all refrigerants and condensate piping above ceiling · Test and charge system to verify operation. Electrical · Install new dedicated 208V, 3-phase power circuit · Provide NEMA 4X, 60A non-fused stainless steel disconnect at outdoor unit · Provide power and control conduit and wiring to/from all units · Penetrate concrete wall. · Provide penetration and conduit through roof deck. Patch and flash roof as required to maintain new roof warranty through Carlisle Roof installer. Controls · Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet · Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable · Submit point list, graphics, and control narrative to COR for approval. · Program unit set points, and update AHU-3 supply air setpoints · Support commissioning of system to validate operation. Structural & Interior · Concrete core penetration for pipes and conduits · Provide support framing for all units and steel plates as shown in drawing. · Provide support for pipes and conduits. · Work to include wall restoration and painting.