C-5 Honeycomb Contract Strategy
Subject: C-5 Honeycomb Contract StrategySolicitation Number: C-5-Honeycomb-Contract-StrategyNotice Type: SRCSGTNotice Published: 03-04-26Response Due: 03-26-26Agency: Department of the Air ForceOffice: F3YCCF 448 SCMWContact: Tracey Beringer This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (777) 221-1Office Address: TINKER AFB, OK 73145-0000Place of Performance: Tinker AFB, OK 73145
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The C-5 Galaxy aircraft relies on varius adhesive bonded honeycomb panels to provide aerodynamic contours and adds structural integrity to airframes. Manufacturing bonded panels requires strict control in facility contamination levels, building temperature/humidity, tracking adhesive life, autoclave operation and bond line surface preparations. C-5 bonded panel manufacturing follows detailed processing specifications, and in the case of highly contoured areas, requires an experienced technical staff to interpret aircraft loft data.