Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
Subject: Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)Solicitation Number: W9128F26RA017Notice Type: PRESOLNAICS: 237130Notice Published: 03-06-26Response Due: 04-30-26Agency: Department of the ArmyOffice: W071 ENDIST OMAHAContact: Brandon Landis This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (402) 995-2056Office Address: OMAHA, NE 68102-4901Place of Performance: Colorado, Nebraska, and Wyoming 82001Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
Update 0001 (6 March 2026): This acquisition has been updated to include Design-Bid-Build (DBB) as shown within the title. Reference the attached pre-solicitation notice and associated documents. Previously related notices were 1) W9128F25SM032 - Sources Sought Announcement of Ground Based Strategic Deterrent Utility Corridor, Francis E. Warren Air Force Base, Wyoming and 2) Industry Day - Ground Based Strategic Deterrent Utility Corridor, Francis E. Warren Air Force Base, Wyoming for reference.