Kansas City Levees UPRR Closure Structure


Subject: Kansas City Levees UPRR Closure Structure
Solicitation Number: W912DQ26RA035
Notice Type: SOLICIT
NAICS: 237990
Notice Published: 03-09-26
Response Due: 04-23-26

Agency: Department of the Army
Office: W071 ENDIST KANSAS CITY
Contact: Myleesa France This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (816) 389-3805
Office Address: KANSAS CITY, MO 64106-2896
Place of Performance: 435 River Park DriveKansas City, Kansas 66105

Related Notices:
        08-24-26 AWARD

        03-10-26 SOLICIT

        03-18-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees. Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track. Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.