Buffalo Creek Boiler Replacement


Subject: Buffalo Creek Boiler Replacement
Solicitation Number: 1240LT26C0020
Notice Type: SOLICIT
NAICS: 238220
Set-Aside: Total Small Business
Notice Published: 03-11-26
Response Due: 03-13-26

Agency: Department of Agriculture
Office: FOREST SERVICE
Contact: Erick Plamann This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: PUEBLO, CO 81008
Place of Performance: Pine, CO 80470

Related Notices:
        05-13-26 AWARD


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Project: Buffalo Creek Boiler Replacement POC: Erick Plamann, Contract Specialist, This email address is being protected from spambots. You need JavaScript enabled to view it. for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation. Magnitude of Construction is between $25,000 and $100,000 Site Visit: P.O.C. Name: Corey Lewenkamp Address: 18046 CO RD 126 Pine CO, 80470 Date and Time: February 25, 2026, 1:00 PM Mountain Telephone: 719-744-7196 P.O.C. Email: This email address is being protected from spambots. You need JavaScript enabled to view it. Attachment 1 Solicitation Terms and Conditions Attachment 2 SOI Attachment 3 SOW Attachment 4 BCWC Dwelling Mech & Elec Systems Info Attachment 5- Product Specs Attachment 6- Wage Determination Questions shall be submitted via email to Erick Plamann, Contract Specialist at This email address is being protected from spambots. You need JavaScript enabled to view it. no later than March 4, 2026, at 12:00 PM Central Time. Quotes shall be submitted via email to Erick Plamann, Contract Specialist at This email address is being protected from spambots. You need JavaScript enabled to view it. no later than 12:00 p.m. Central Time on March 13, 2026.