Repair B632, Fire Suppression & Hangar Door
Subject: Repair B632, Fire Suppression & Hangar DoorSolicitation Number: W50S7T26BA001Notice Type: PRESOLNAICS: 236220Set-Aside: Total Small BusinessNotice Published: 04-02-26Response Due: 06-10-26Agency: Department of the ArmyOffice: W7M6 USPFO ACTIVITY ILANG 182Contact: Melissa Grice This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (520) 691-4110Office Address: PEORIA, IL 61607-5004Place of Performance: Peoria, IL 61607Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The Illinois National Guard intends to issue an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for Repair of the Fire Suppression and Hangar Door for Building 632 at the 182d Airlift Wing, Peoria, IL. Work includes the repair of the existing fire protection and detection systems. Remove existing AFFF tanks and existing piping and replace with new water pipes and pumps. Resize pumps in the Base Pump House, Building 831 to adequately provide pressure to the fire water loop. Remove existing Megadoor hangar doors at north door of building 632, mullion doors, motors, and associated conduit, wire, etc. Provide and Install new Megadoor vertical lift hangar door system and associated components. The Megadoor vertical lift hangar door by ASSA ABLOY is sole source specific for compatibility to existing installation systems (noted justifications will be included with solicitation). In addition to the base work described above, the solicitation will include the following option line item: Option 1: Provide and Install New Generator. The contract duration will be 365 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for Small Business. The North American Industry Classification System (NAICS) Code is 236220, with a small business size standard of $45,000,000. The magnitude of construction is between $5,000,000 and $10,000,000. The tentative date for issuing the solicitation is on-or-about April 30, 2026. The tentative date for the pre-bid conference is on-or-about May 20, 2026, time and location to be provided in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted by May 15, 2026 via email to This email address is being protected from spambots. You need JavaScript enabled to view it.. The bid opening date is tentatively planned for on-or about June 10, 2026. Actual dates and times will be identified in the solicitation. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractors 85 percent subcontract amount that cannot be exceeded. In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offerors inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.