Level 2 FRP Over Lab Ceilings Installation- COFC0401


Subject: Level 2 FRP Over Lab Ceilings Installation- COFC0401
Solicitation Number: 75D301-26-R-73423
Notice Type: SOLICIT
NAICS: 236220
Set-Aside: HUBZone
Notice Published: 04-08-26
Response Due: 04-27-26

Agency: Department of Health and Human Services
Office: CENTERS FOR DISEASE CONTROL AND PREVENTION
Contact: Brad Edwards This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: ATLANTA, GA 30333
Place of Performance: Fort Collins, CO 80521

Related Notices:
        03-25-26 SOLICIT

        04-27-26 SOLICIT

        05-07-26 SOLICIT

        08-26-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Amendment 0001 (See Attached): A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instructions and the required Visitor Request Form (VRF). SOLICITATION DETAILS The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas. The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government. Period of Performance: Completion is required within 180 days after Notice to Proceed. Minimum Vendor Qualifications: Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.