Z1LZ--Parking Garage (Building 213) Maintenance and Repairs MTH VAMC


Subject: Z1LZ--Parking Garage (Building 213) Maintenance and Repairs MTH VAMC
Solicitation Number: 36C24926Q0173
Notice Type: SOLICIT
NAICS: 238990
Set-Aside: Service-Disabled Veteran-Owned Small Business
Notice Published: 04-28-26
Response Due: 04-30-26

Agency: Department of Veterans Affairs
Office: VETERANS AFFAIRS, DEPARTMENT OF
Contact: This email address is being protected from spambots. You need JavaScript enabled to view it., Diane Ziegler This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (615) 225-6479
Office Address: MURFREESBORO, TN 37129


Related Notices:
        04-28-26 SOLICIT

        04-15-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Q & A RFQ 36C24926Q0173 Q: Inquiring to see if there is going to be a site-walk visit? A: Yes, if requested. Q: We would like to submit questions in relation of the scope. See below: Is power washing required monthly, quarterly, or only as needed? Is re-striping expected annually, as needed, or included in the monthly service price? Should the contractor assume full re-striping each cycle or only touch-up of faded markings? How many weld repairs are anticipated annually? The SOW species Weld Repairs (each) how is a single repair defined (LF, location, or connection)? Will a pre-bid site visit be scheduled to assess current condition of the parking garage? A: Cleaning shall be conducted biannually, specifically post-winter season and pre-winter season. The scheduling will be coordinated with the selected contractor. The request for painting services is for once a year. It is anticipated that the coating will maintain its integrity for a minimum of one year; failure to do so will necessitate the contractor performing all applicable touch-up procedures at no additional cost. The scope of work entails repairing one of the connection joints between the panels, comprising ten pre-installed stainless steel plates arranged at designated intervals along the joint. After welding, the joint must be sealed with an approved silicone sealant to safeguard the plates from environmental damage; the proposed silicone product must be submitted for formal approval prior to application. The scope of work entails repairing one of the connection joints between the panels, comprising ten pre-installed stainless steel plates arranged at designated intervals along the joint. Yes, if requested.