Amendment 0002- Combined synopsis/solicitation for Architect-Engineer (A-E) services


Subject: Amendment 0002- Combined synopsis/solicitation for Architect-Engineer (A-E) services
Solicitation Number: W912C326RA007
Notice Type: SOLICIT
NAICS: 541330
Set-Aside: Total Small Business
Notice Published: 04-29-26
Response Due: 05-04-26

Agency: Department of the Army
Office: W6QM MICC-FORT BUCHANAN (RC)
Contact: AHEISHA CROOKS This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: FORT BUCHANAN, PR 00934-4572
Place of Performance: Rodriguez Army Health Clinic, Building 21, 21 Patriot Blvd., Fort Buchanan, PR 00934. 00934

Related Notices:
        04-20-26 SOLICIT

        03-24-26 SOLICIT

        03-24-26 SOLICIT

        04-16-26 SOLICIT

        04-16-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

This is a combined synopsis/solicitation for Architect-Engineer (A-E) services prepared in accordance with Federal Acquisition Regulation (FAR) Part 36.2, Brooks Act. The Government intends to award a firm-fixed-price contract for the services described herein.1. PROJECT DESCRIPTIONThe Contractor shall provide all necessary professional engineering services to conduct a comprehensive assessment of a single-story, approximately 12,000 square foot clinic facility located in Puerto Rico. The work consists of a Base requirement and one (1) Optional requirement.? Base Requirement: A complete non-invasive structural assessment to evaluate the building?s structural integrity, identify deficiencies, and provide a report with a prioritized list of recommended repairs and an estimated magnitude of cost.? Optional Requirement: A complete mechanical (HVAC) assessment to evaluate the condition and performance of the HVAC system and its components. This includes performing an engineering analysis based on ACCA Manuals N, S, and D to determine if the equipment and ductwork are correctly sized and configured for the facility. If exercised, this option will require a separate report with prioritized recommendations and cost estimates.The Government may exercise the Option at its sole discretion after a review of the Structural Assessment Report. A detailed Statement of Work is provided in the attachments.