Turner Roof and Building Envelope Project


Subject: Turner Roof and Building Envelope Project
Solicitation Number: 47PD5526R0042
Notice Type: SOLICIT
NAICS: 236220
Set-Aside: Total Small Business
Notice Published: 07-15-26
Response Due: 08-27-26

Agency: General Services Administration
Office: PUBLIC BUILDINGS SERVICE
Contact: John Morelion This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: Washington, DC 20405
Place of Performance: Turner, MT

Related Notices:
        07-17-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

The U.S. General Services Administration intends to solicit construction services for the Turner Roof & Building Envelope Project at the Turner Land Port of Entry, 41725 Turner Road, Turner, Montana 59542, Building No. MT0055AW. The project includes roof replacement and building envelope improvements at the main building, including work on the U.S. and Canadian sides of the facility, and envelope improvements at the water treatment building. Work includes, but is not limited to, selective demolition, roof replacement, exterior wall/cladding repairs, thermal and moisture protection, metals, openings, finishes, and incidental electrical, communications, and security-related coordination. The facility will remain occupied and operational during construction. The contractor must phase and secure the work daily, maintain safe access, protect ongoing border operations, and coordinate with GSA, CBP, CBSA, and other stakeholders regarding antennas, cameras, cables, signs, access, security, and inspections. Work affecting the Canadian side may require Canadian access, work permit, and material import coordination. Certain roofing materials may be furnished through the existing roofing warranty process; the contractor will be responsible for coordinating those materials with the manufacturer/certified installer and providing all remaining labor, materials, equipment, supervision, bonds, permits, and incidentals required to complete the work. The contractor shall comply with the solicitation documents, drawings, specifications, applicable codes and standards, GSA PBS Core Building Standards, security and badging requirements, environmental survey requirements, fire/life safety requirements, submittal requirements, and closeout requirements. The anticipated period of performance is 150 calendar days after notice to proceed. The solicitation is expected to include base bid work for the main building roof and envelope on the U.S. side, main building roof and envelope on the Canadian side, and water treatment building envelope work on the U.S. side. An in-person site visit is anticipated. Currently the date is TBD.