66 ABG/SC Giant Voice RTU Relocation


Subject: 66 ABG/SC Giant Voice RTU Relocation
Solicitation Number: FA283526Q0020
Notice Type: SOLICIT
NAICS: 811210
Set-Aside: Total Small Business
Notice Published: 07-21-26
Response Due: 08-10-26

Agency: Department of the Air Force
Office: FA2835 AFLCMC HANSCOM PZI
Contact: Kennethea Berry This email address is being protected from spambots. You need JavaScript enabled to view it.
Office Address: HANSCOM AFB, MA 01731-2107
Place of Performance: Hanscom AFB, MA 01731

Related Notices:
        07-15-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

Relocate one (1) Giant Voice (GV) Remote Terminal Unit (RTU) from the 3rd floor of building 1108. This RTU is one of six RTUs that are part of the base-wide ATI Mass Alert system, which is controlled by two Central Control Units (REACT 5000s). The Contractor shall provide all specialized labor, materials, tools, equipment, and supervision required to safely power down, physically transport, re-install, and re-integrate the system. The objective is to ensure the RTU is restored to Full Operational Capability (FOC) in the new location. This includes the proper handling of all associated radio frequency (RF) cabling, network connections, power configurations, and grounding systems, as well as conducting comprehensive post-move testing and optimization to verify system integrity. NOTE: (Amended) A site visit is scheduled for 30 July 2026 at 9:00am EST at Hanscom AFB, MA. You MUST register prior to attending. Registration to attend the site vist must be provided to This email address is being protected from spambots. You need JavaScript enabled to view it. and This email address is being protected from spambots. You need JavaScript enabled to view it., no later than, Tuesday 28 July 2026 at 9:00am, see attached for registration form. Attendance at the site visit is mandatory for a quote to be considered technically acceptable. A physical site survey is critical for this effort. The vendor must personally inspect both the current and future locations of the unit to evaluate the existing infrastructure. Additionally, the vendor must take precise physical measurements for cable lengths and directly assess the available power utilities to ensure technical feasibility.