611 CES Wheeler B310 Fire Suppression System Testing
Subject: 611 CES Wheeler B310 Fire Suppression System TestingSolicitation Number: FA521526Q0053Notice Type: SOLICITNAICS: 561621Set-Aside: Total Small BusinessNotice Published: 09-18-26Response Due: 09-24-26Agency: Department of the Air ForceOffice: FA5215 766 ESS PKPContact: A1C Michael R. Perreira This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (808) 789-3167Office Address: JBPHH, HI 96860-4928Place of Performance: Wahiawa, HI 96786Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The objective of this contract is to secure certified technical services to troubleshoot the FACP, perform all lapsed ITM cycles, repair identified deficiencies, and fully recertify the system. All inspection, testing, maintenance, and repair of the fire suppression and detection systems shall be performed in strict accordance with DAFMAN 91-203, Chapter 6 (Fire Protection and Life Safety), and UFC 3-601-02 (Fire Protection Systems Inspection, Testing, and Maintenance). The primary fire suppression and alarm systems for Building 310 at Wheeler Air Force Station are currently out of compliance. A recent Fire Department assessment identified that Sprinkler Inspection, Testing, and Maintenance (ITM) has not been accomplished since 2016, and the Fire Alarm Control Panel (FACP) ITM has lapsed and is actively displaying a "trouble" status. Quotes are due by 8:00 AM HST September 24, 2026. Reference the attached documents; 1. Performance Work Statement 2. Provisions and Clauses 3. Additional Clauses 4. SCA Wage Determination 5. Itemized Price List 6. SF1449 7. RFQ Point of contact: Contracting Specialist: A1C Michael R. Perreira This email address is being protected from spambots. You need JavaScript enabled to view it. 808-789-3167 Contracting Officer: SSgt Thomas Hembree This email address is being protected from spambots. You need JavaScript enabled to view it. 808-789-3170