PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Subject: PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATIONSolicitation Number: 378854_MRNotice Type: SOLICITNAICS: 23822Set-Aside: No Set aside usedNotice Published: 11-03-26Response Due: 11-19-26Agency: Department of EnergyOffice: ENERGY, DEPARTMENT OFContact: Michele Reynolds This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (630) 840-2448Office Address: Batavia, IL 60510Place of Performance: Batavia, IL 60510Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: Ocotber 27, 10:00a CDT Last Day for Questions: November 5, 2026, 4:00p CDT PROPOSALS DUE: November 19, 2026, 2:00p CDT To attend the Pre-Proposal Meeting and Site Visit, PPE is required. As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID. Please note that when entering Fermilab: All vehicles are subject to search No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site. No explosives or any other apparatus or material hazardous to the public or property are allowed on site. No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable. No personal alcohol or marijuana No Smoking or vaping within buildings and within 15-25 feet of entrances Illinois Rules of the Road are to be followed while driving on Fermilab?s premises.