J012--Fire Suppression System Maintenance and
Subject: J012--Fire Suppression System Maintenance andSolicitation Number: 36C25027Q0078Notice Type: SOLICITNAICS: 811310Notice Published: 11-19-26Response Due: 12-08-26Agency: Department of Veterans AffairsOffice: VETERANS AFFAIRS, DEPARTMENT OFContact: Stacie I Hill, Contract Specialist This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: DAYTON, OH 45428Awarded to: Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
Site Visit: A site visit will be held on December 1, 2026, at 9:00 a.m. ET. Interested vendors should meet at building 6 at the Richard L. Roudebush VA Medical Center, 1481 W. 10th Street, Indianapolis, IN 46202. See map and pinned location below for building 6. Following the walkthrough of the main hospital, vendors may attend an additional walkthrough at the off-site location: 9045 East 59th Street, Building 402, Indianapolis, IN 46216. Please note that transportation to the off-site location will not be provided by the VA. RFI Responses Submitted by: Gunnar Sager, COO, FinalLine Solutions L.L.C. INFORMATION NEEDED: 1.Site visit PWS §§ 7, 8, 11 and Appendix A. Can the VA arrange a pre-quote site visit at both the main medical center and Building 402 for FinalLine Solutions and its prospective kitchen exhaust cleaning and fire protection subcontractors? We would like to see the three Canteen hoods (C-1166), the Production Kitchen hood (C-B144) and its upper-floor duct and fan connections, the rooftop exhaust fans, the Building 402 hood, suppression system and grease trap, and the Kidde IND-21 units at Buildings 1 and 22. Please provide available dates and times, the meeting location, and any registration, escort or ID requirements. Yes, a pre-quote site visit can be arranged. 2.Exhaust duct routes and access PWS § 7 and Appendix A.2. PWS § 7 refers to "the eight previously listed main-campus duct systems." Please identify those eight systems. Can the VA also provide any available duct drawings or route sketches, fan and access-panel locations, and known inaccessible sections, particularly for the Production Kitchen and the fourth- and fifth-floor connections? If a site visit cannot be arranged, please provide any photos or prior cleaning reports that show existing access conditions. The eight systems were a reference to language in the previous contract. The PWS has been updated to remove that language, as the VA is uncertain what it was referring to. The PWS has also been updated to include exhaust fan locations. The rest can be determined by a site visit. Previous cleaning reports, including one dated April 2026 is attached, that includes photos in response to this RFI. 3.Building 402 grease trap PWS §§ 8, 11 and Appendix A.3. Please confirm the trap type and capacity (gallons), the cover location, and the approved overnight pump-truck staging location. If known, please provide the approximate hose distance from the staging point to the trap and any vehicle size, weight or access restrictions. Unknown. Can be determined by the offeror during scheduled site visit. 4.Building 402 equipment Appendix A.1 and A.2. Please confirm the make, model and agent type of the Building 402 kitchen suppression system (KS-05) and the exhaust fan ID serving hood KH-05. Unknown. Can be determined by the offeror during a scheduled site visit. 5.Prior service history PWS § 5 and Appendix A.4. PWS § 5 requires the schedule to use verified prior service dates and states that a contract transition does not restart intervals. Please provide the current or most recent contractor's service records, or at minimum the last completion dates, for each suppression unit (monthly, semiannual and annual), each hood cleaning (KH-01 to KH-05) and the GT-01 pump-out. Please also identify any work currently overdue. According to our records it is believed to be as follows: KH-1 to KH-04 Fire Semi-Annual Inspections were completed on 10/20/2026. Cleanings for these systems were completed on 10/26/2026. KH-5 was cleaned in September 2026, the Semi-annual inspection date is unknown and assumed due. GT-01 was cleaned in September 2026. HM-01 to HM-05 Semi-annual inspections were completed on 10/20/2026. 6.Extended-interval testing PWS § 9 and Appendix A.4. Please identify any extended-interval maintenance or testing known to be due during the base or option years, along with the affected system IDs and anticipated due dates. If any of this work must be priced with the quote, please identify the applicable line item. See updated pricing schedule attached. 7.Personnel credentialing VAAR 852.204-70 and 852.204-72; PWS § 11. Will contractor and subcontractor technicians performing recurring monthly and quarterly service need PIV cards or background investigations, or will VA-issued temporary or visitor badges be sufficient? Please identify any processing lead time needed before the first visit. Contractor and subcontractor personnel must satisfy the applicable VA personnel-vetting and credentialing requirements before beginning work. The required investigation level, identification credential, and processing lead time will be confirmed by the CO in coordination with the responsible VA security personnel. A visitor badge shall not be assumed to replace required vetting. 8.Price schedule format Solicitation § B.2; PWS § 2 and Appendix B. Section B.2 requests a single monthly price for each performance year, while PWS § 2 calls for separately identifiable service categories. Will the VA accept the completed B.2 schedule with a separate supporting price breakdown by service category (monthly suppression inspections, semiannual suppression service, hood inspection and cleaning, grease trap service), or is there a required format? See updated pricing schedule attached. 9.Anticipated start date Solicitation § B.2; PWS § 2. Is January 1, 2027 still the anticipated start date for the base period? This is a target start date- the POP for the base will begin upon award. Submitted by: Healing Hands Healing Hearts, LLC INFORMATION NEEDED: 1. PWS Section 7 - Please confirm whether all areas of the kitchen exhaust systems, including the hoods, ductwork, exhaust fans, and rooftop components, are easily accessible for cleaning. If any special access equipment is needed, please advise. Offeror can make this determination during a scheduled site visit. 2. PWS Sections 6 / Appendix B - If deficiencies are found during inspection or maintenance, please confirm whether repairs and replacement parts are included in the contract price or will be handled separately by the Government. PWS Section 6.2 specifically mentions Replace metal fusible links at the required interval, and replace routine seals, nozzle caps, and other included consumables as required. Use the correct listed parts and temperature ratings. Do not treat reusable detection elements as disposable metal links . However, contract terms to be determined by the CO. 3. Appendix A.1 / A.4 - Please provide, if available, the make/model and system size or cylinder/tank capacity for the fire suppression systems included in the scope, along with the most recent inspection reports. Included previous inspection reports with that information to CO in response to this RFI-see attached. Contractor is responsible for determining accuracy. A pre-bid site visit can be arranged. 4.PWS Section 7 / Appendix A.4 - Please advise when each kitchen exhaust system was last cleaned and provide the most recent cleaning reports, if available. See attached. 5. PWS Section 8 / Appendix A.3 - For the grease trap at Building 402, please provide the approximate size/capacity, location, and access conditions, and confirm whether the contractor is responsible for disposal of the removed grease/waste. Site Visit Request: We would also like to request a site visit prior to the proposal due date, if possible, to review the systems and existing site conditions. Please see information above regarding site visit information. Submitted by: Thomas Robinson, CSIC Solutions LLC INFORMATION NEEDED: Appendix A.1 lists KS-01 through KS-04 as ANSUL wet chemical (NFPA 17A), but KS-05 (kitchen suppression, 59th Street, Building 402; KH-05) shows only 'Installed kitchen system / Manufacturer manual.' Please provide the manufacturer, model, and agent type of the KS-05 system so offerors can confirm factory-authorized technicians for that make and model and price it accurately. Please see information above regarding site visit information. Submitted by: HurtVet Fire & Security INFORMATION NEEDED: 1.Section B.2 provides one line item per performance period, but PWS Section 2 states recurring services shall be firm-fixed-price "with separately identifiable service categories in the pricing schedule." Will the Government amend Section B.2 to add sub-line items for each service category in PWS Appendix B, or should offerors price only the single line item shown? Updated PWS and pricing schedule attached. 2. PWS Section 9 states scheduled extended-interval work (such as 6-year maintenance and 12-year hydrostatic testing of agent cylinders) shall be performed "only under its applicable fixed-price line item," but Section B.2 contains no such line item. Should offerors exclude extended-interval work from the quoted price, with any required work added later by Contracting Officer modification? Updated PWS and pricing schedule attached. Extended-interval work is not priced in separately. Extended interval work should be identified during inspections. 3. Invoicing is monthly in arrears against a 12-month unit of issue, while most services occur quarterly or semiannually. Will the Contractor invoice 1/12 of the annual price each month, or invoice only for services completed and accepted in that month? See updated pricing schedule. 4. Since price is the only evaluation factor, is any documentation required with the quote beyond the completed SF 1449, the priced Section B.2 schedule, the signed Attachment II (VAAR 852.219-75), and acknowledgment of amendments? No further documentation is required. 5. This is a recurring service with no information and communication technology deliverables. Please confirm that offerors are not required to submit a Section 508 checklist with the quote. This is not a requirement with the quote. 6. The PWS requires the Contractor to verify duct routes, fan locations, and grease trap conditions that are not fully defined in the solicitation. Will the Government hold a site visit before the December 1, 2026 quote due date? Please see above for site visit information. 7. Please provide the contract number and contractor name for the current or most recent contract covering these services. The previous contract is 36C25024C0010, awarded to Veterans Fire & Life Safety. 8. Because a contract transition does not restart service intervals, please provide the most recent semiannual service date and service report for each of the ten suppression systems (KS-01 through KS-05 and HM-01 through HM-05). According to our records it is believed to be as follows: KH-1 to KH-04 Fire Semi-Annual Inspections were completed on 10/20/2026. Cleanings for these systems were completed on 10/26/2026. KH-5 was cleaned in September 2026, the Semi-annual inspection date is unknown and assumed due. GT-01 was cleaned in September 2026. HM-01 to HM-05 Semi-annual inspections were completed on 10/20/2026. 9. Please provide the last 6-year maintenance date, last 12-year hydrostatic test date, or cylinder manufacture date for each of the ten suppression systems, so offerors can identify extended-interval work that falls within the base or option periods. Unknown. 10. Please provide the most recent full cleaning date and cleaning report for each hood (KH-01 through KH-05) and its connected exhaust system. Unknown. 11. Please provide the most recent pump-out date for GT-01 and the typical volume removed per service. Unknown. 12. KS-05 is listed only as an "Installed kitchen system." Please provide the manufacturer and model of KS-05 so offerors can price the correct manufacturer-authorized service, parts, and technician qualifications. Unconfirmed. Offeror can make determination during a scheduled site visit. 13. Please provide the most recent service report or equipment inventory for KS-01 through KS-05 showing agent cylinder quantity and size and the number and type of detection devices on each system. Please see attached. 14. Metal fusible links are to be replaced "at the required interval." Should offerors price fusible link replacement at both semiannual services each year, or at one service per year? For ANSUL R-102 systems using disposable metal fusible links, include replacement at both semiannual services. ANSUL s owner s guide specifies semiannual replacement. For other installed systems, follow their applicable manufacturer requirements. Reusable detection elements are not automatically replaced as disposable links. 15. The PWS cautions against treating "reusable detection elements" as disposable metal links. Which of the ten systems, if any, use reusable or electric detection instead of metal fusible links? No verified list identifies which units use reusable or electric detection. The PWS language is a maintenance precaution, not confirmation that a particular system has those components. 16. Please identify the detection and actuation method for HM-01 through HM-05 (mechanical fusible link, electric thermal detection with a releasing panel, or manual actuation only). Information available does not establish whether each installed system uses mechanical detection, electric detection/releasing controls, or another arrangement. Do not infer the complete configuration from the IND-21 designation alone. 17. ANSUL training versus authorized distributor status Manufacturer training alone should not be treated as sufficient where manufacturer authorization is also required. ANSUL s owner s guide calls for maintenance by an authorized ANSUL distributor. The firm actually performing R-102 maintenance should meet that authorization requirement. The prime may use a qualified subcontractor, subject to the solicitation s subcontracting requirements. 18. For suppression system alarm interface testing, please confirm that VA personnel will place the building fire alarm system in test, notify the monitoring station and fire department, and restore the fire alarm system after testing. VA-authorized fire alarm personnel manage building alarm test mode, required monitoring/dispatch notifications, and restoration. The suppression contractor performs and documents its system/interface tests in coordination with those personnel. No testing or impairment should begin without the required coordination. 19. After functional testing of fuel shutoffs, will VA food service or facilities staff relight pilots and return cooking appliances to service, or is the Contractor responsible for this task? The contractor must restore the suppression components and shutoffs affected by its work. Pilot relighting and cooking-appliance restart must be coordinated with VA Food Service/Facilities and performed by qualified, authorized personnel. 20. The PWS references "the eight previously listed main-campus duct systems," but these duct systems are not listed in the solicitation. Please provide this list and identify which hood and exhaust fan each duct system serves. The eight duct systems description appears in the previous contract, but those eight were not individually mapped to hoods and fans. The PWS has been updated to remove this language. 21. Can the Government provide mechanical drawings showing the duct routes, existing access panel locations, and exhaust fan locations for KH-01 through KH-05? No complete verified route/access-panel drawing set has been established in the materials reviewed. 22. Please identify the location and means of access (roof hatch, stairs, fixed ladder, or lift) for exhaust fans 148, 144, 145, and 168. Hood Fan Fan location Access Canteen Hood 1 EF 148 C-Wing second-floor roof Door in C-3154 Canteen Hood 2 EF 144 C-Wing second-floor roof Door in C-3154 Canteen Hood 3 EF 145 C-Wing second-floor roof Door in C-3154 Production Kitchen EF 168 C-Wing fifth-floor penthouse roof Door in C-5096 These locations are recorded in the revised PWS sent to the CO in response to this RFI. 23. Please provide the hood length, exhaust fan quantity, and exhaust fan location for KH-05 at Building 402. KH-05 s hood length, exhaust fan quantity, fan ID, and fan location have not been verified. Offeror can make their own determination during a scheduled site visit. 24. What Infection Control Risk Assessment (ICRA) containment class should offerors price for duct access points located outside the kitchens, such as the fourth- and fifth-floor duct connections? All duct access points are located outdoors on the roof. No ICRA containment class has been established. 25. May captured cleaning wash water be discharged to a VA sanitary drain served by a grease interceptor, or must all wash water be containerized and hauled off site? No discharge to roofs or storm drains is permitted at the main campus facility. The PWS does not provide blanket authorization to discharge recovered wash water into a sanitary drain. Offeror should plan to containerize and haul grease offsite. 26. Will VA designate an overnight staging location near rooms C-1166 and C-B144 for a service vehicle carrying pressure-washing and wash-water recovery equipment? Yes 27. Please provide the type of GT-01 (in-ground interceptor or under-sink trap) and its rated capacity in gallons. Offeror can determine this during a scheduled site visit. 28. Is GT-01 accessible by vacuum truck from a paved drive or parking area at Building 402? Offeror can determine this during a scheduled site visit. 29. Will the COR or a designee be available by phone during the overnight work windows (as late as 5:00 a.m.) for the required arrival and departure check-ins? Arrival and departure notifications remain required during overnight work. The PWS permits the COR to designate a telephone or electronic contact method. . 30. Will Contractor personnel performing monthly and quarterly visits require PIV cards, or will VA issue temporary visitor badges for each visit? Contractor and subcontractor personnel must satisfy the applicable VA personnel-vetting and credentialing requirements before beginning work. The required investigation level, identification credential, and processing lead time will be confirmed by the CO in coordination with the responsible VA security personnel. A visitor badge shall not be assumed to replace required vetting.